Attempt 4
Back to durable goal · Attempt history
Targeted failures and scope
PR 32 commit 7cfef071 is remotely reproducible but is not a final candidate:
three review findings are valid. The user also requires the four
projects/agents changes from PR 24, whose missing decision-review package
explains the current base’s dangling instruction reference.
Hypotheses
- Applying PR 24’s changes three-way will preserve newer
goalguidance while importing its result-first additions, Bazel batching guidance, anddecision-reviewpackage. - Treating command overflow as bounded success will preserve useful prefixes for search and diff consumers without leaking child processes or invalid UTF-8.
- Enforcing
max_changesbefore every porcelain status record will bound all record kinds uniformly. - Closing admission, draining registered package locks, then disposing active workers will make shutdown linearizable with concurrent run/reload.
Exact inputs and boundaries
- Current and published task commit:
7cfef0719075ad372c3bb257ad216b35770356b2. - Current base/direct parent:
7ad2704cd27757355ab36ec8eb1bb27ef9e1d91d. - PR 24 base/head:
ada3ed90123c224729f9174c6127c50b933d2f48/da2085f1807bfea1c7f3979730f6b7df0033fdce. - Import boundary: only paths beneath
projects/agentschanged by PR 24. - Review boundary: the three existing PR 32 threads and directly required regression coverage; no unrelated runtime redesign.
- Preserve all immutable package versions already referenced by manifests.
Candidate plan
- Merge the PR 24
bazel-agentandgoalhunks into current files; adddecision-reviewplus the offline eval structure required today. - Add black-box execution overflow coverage and implement bounded UTF-8-safe truncation while preserving timeout/spawn errors.
- Add table-driven status-limit coverage and publish a new immutable
git_worktreeversion with the limit check before record parsing. - Add a deterministic concurrent activation/shutdown gate and memoized shutdown sequence that waits for admitted locks before disposal.
- Run focused tests first, then both affected packages, Buildifier, exact diff checks, delivery preparation, exact-candidate validation, publication, and review-thread replies/resolution.
Planned acceptance packet
- PR 24 provenance maps exactly to the imported agent changes; newer main guidance remains present.
decision-reviewvalidates and its Promptfoo configuration loads offline.- Output at and beyond the cap is bounded, UTF-8 valid, truncation-marked, and stopped; under-cap and timeout behavior remain correct.
- Every porcelain-v2 record kind obeys
max_changes. - Shutdown cannot resolve before an already-admitted activation is owned and
disposed, and later calls reject
runtime_closed. - All previous MCP lifecycle, restart, package, and stdio regressions remain green on the exact delivered commit.
Progress, approach, and process audit
- Remote publication improved delivery evidence but exposed three absolute correctness failures; validation success alone was insufficient.
- The PR 24 request resolves an upstream packaging inconsistency and is independent enough to integrate before runtime corrections.
- The current representation remains viable: every defect has a narrow controlling mechanism and deterministic test. No evidence supports replacing Cordis, the worker boundary, or content-addressed persistence.
Work performed
- Imported all four PR 24 agent-tree changes three-way and added the offline validation files required by current repository policy.
- Changed
ctx.exec()overflow from an output-limit rejection to a bounded, UTF-8-valid success result with explicit process-group cleanup and a truncation flag. - Published the corrected Git parser as new immutable version
de978...while retaining70d8...as permanent rollback history. - Made shutdown join admitted activation locks before its final active-worker snapshot and added closure checks around initialization storage awaits.
- Added direct regressions plus an actual
git_comparecap integration case.
Verification evidence
- Four focused Bazel tests: pass.
- Complete MCP package plus three skill eval-config targets: ten of ten pass.
- Complete MCP package build plus three skill libraries: pass; all skill validation aspects pass.
- Root
//:buildifier_test: pass. - JavaScript syntax, exact new version SHA-256, quick skill validation, and
git diff --check: pass.
Final verdict
Refine. The product and packaging gates were green, but independent review found silent output-loss and exact-limit semantics that those gates did not exercise. Preserve the architectural changes; Attempt 5 changes the affected contracts and tests rather than discarding the worker/runtime design.