Artifact log

Back to durable goal

Thin-wrapper strategy reset, 2026-08-30

  • Attempt 10 plan: dependency-owned reload serialization with deterministic slow-evaluation and slow-activation regressions. Review verdict: focused tests pass; complete delivery evidence remains open.
  • Pinned HMR patch: standard pnpm patch that serializes the package’s module reload task and drains newly stashed URLs. Review verdict: exact-package apply check and focused regressions pass.
  • Attempt 9 plan: atomic persistence plus official Cordis Include/HMR, with the custom source-marker and acknowledgement transaction removed. Review verdict: refine after reproducing an HMR overlap race.

Published candidate review reset, 2026-08-30

  • Attempt 8 review corrections: fail-closed recursive fallback, UTF-8 byte offsets, and valid-prefix HTTP previews. Review verdict: accepted locally with focused and complete package evidence.

  • Attempt 7 current record: official Loader, Include, and HMR architecture using cordis.yaml and normal ESM modules. Review verdict: active replacement candidate; exact delivery gates remain open.

  • Attempt 6 historical record: rejected worker/version-store architecture, its package hashes, and focused evidence. Review verdict: superseded by the standard Cordis architecture in Attempt 7.

  • Attempt 5 candidate and validation packet: exact implementation, immutable hashes, and current test/build results. Review verdict: rejected by the completed independent review.

  • Attempt 5 plan: exact response to independent review’s semantic and evidence gaps. Review verdict: proceed.

  • Current MCP Cordis README: documents standard Cordis config, ordinary reusable modules, disposable out modules, HMR, and the bounded ctx.exec() contract. Review verdict: current working-tree interface.

  • Imported decision-review skill: immutable PR 24 instruction payload, now packaged with current offline validation. Review verdict: Bazel validation passes.

  • Attempt 3 commit: immutable published candidate. Review verdict: rejected as final after review.

  • PR 32: evolving delivery vehicle for the runtime-extension goal.

  • PR 24: provenance for the newly requested projects/agents subtree. Review verdict: import its four scoped changes only, merged against the current base.

  • Attempt 4 plan: frozen hypotheses, boundaries, and gates for the import and initial review corrections. Review verdict: rejected as a final candidate by independent source review.

Final local candidate, 2026-08-30

  • Attempt 3 evidence: OIDs, direct rebase parent, forced test/build/format results, and the historical delivery state. Review verdict at the time: accepted locally, then superseded after publication by three valid review findings.
  • Attempt 3 record: preserved implementation and user-facing interface evidence for that historical local candidate. Review verdict: accepted at the time, then superseded by review findings.

Rebased Attempt 2, 2026-08-30

  • Attempt 2 evidence: exact task-only rebase evidence for commit e3e74cb1 onto 7ad2704c. Review verdict: accepted as rebase evidence, not as the final candidate because integrated lifecycle evidence was nondeterministic.
  • Attempt 2 record: preserved documentation and evidence for the rebased server and runtime interface. Review verdict: implementation retained for Attempt 3; final validation was pending.

Attempt 1

  • Attempt 1 record: preserved runtime/interface artifact. Review verdict: rejected as a final candidate because one included package had an undeclared runtime dependency.