This is the multi-page printable view of this section.
Click here to print.
Return to the regular view of this page.
- 1:
- 2:
- 3:
- 4:
- 5:
- 6:
- 7:
- 8:
- 9:
- 10:
- 11:
Attempt history
Back to durable goal
- Attempt 11: consolidate the owned range, reconcile the advanced
base, validate and publish the exact rebased candidate, then incorporate and
reconcile the final hosted review. Complete.
- Attempt 10: keep the thin wrapper and patch pinned Cordis HMR to
serialize reloads and drain writes arriving during an in-flight reload.
Complete locally and carried into Attempt 11.
- Attempt 9: simplify source updates to validated atomic persistence
plus Cordis HMR, deleting the private acknowledgement transaction. Refined
after independent review reproduced a lost overlapping update.
- Attempt 8: correct the final hosted review’s fallback filtering,
byte-offset, and UTF-8 body-preview findings. Complete locally.
- Attempt 7: replace the custom manifest/version store and worker
generations with official Cordis Loader, Include, HMR, standard
cordis.yaml, and normal modules. Delivered, then refined by Attempt 8.
- Attempt 6: make bounded execution backward-compatible, close
process/lifecycle admission races, publish exact package completeness, and
replace worker-side spawning after independent review. Rejected because its
package persistence model was custom rather than standard Cordis.
- Attempt 5: make every output-loss signal and bounded Git result
exact, then cover the imported skill behaviors. Refine after independent
review found lifecycle, compatibility, and policy defects.
- Attempt 4: import PR 24’s scoped agent guidance, then correct the
three valid PR 32 review findings. Refine after independent review.
- Attempt 3: replace a lifecycle test’s elapsed-time inference with
a deterministic started/release handshake. Published, then superseded by
review findings.
- Attempt 2: retained the proven runtime and added a bounded search
fallback for hermetic portability. Starter packages pass; refine because
the integrated lifecycle evidence was timing-dependent.
- Attempt 1: direct Cordis runtime with MCP v2, worker-isolated
generations, two-tier immutable persistence, and three starter packages.
Rejected because one starter package required an unavailable executable.
1 -
Attempt 1
Back to durable goal · Attempt history
Hypothesis
A small adapter around @deepseek-ai/cordis@4.0.1 can provide durable,
transactional runtime packages behind a fixed MCP stdio surface without
embedding DeepSeek Harness or restarting the MCP connection.
- Parent checkpoint: task-start state of branch
t3code/runtime-modifiable-plugin
- Cordis:
@deepseek-ai/cordis@4.0.1
- MCP server/client:
@modelcontextprotocol/server@2.0.0 and
@modelcontextprotocol/client@2.0.0
- Node: repository-pinned Node 24.13.0
- Package source contract: one import-free JavaScript expression returning a
Cordis plugin with
apply(ctx)
Candidate plan
- Add an ordinary Bazel package with a dedicated exact pnpm lock.
- Persist definitions as content-addressed immutable source plus atomic
manifests under explicit
project and scratch roots.
- Evaluate each generation in a worker, mount it through a real Cordis
Context and Fiber, and register handlers through Cordis effects.
- Activate transactionally: prove the candidate ready, swap the active
pointer, drain in-flight calls, then dispose the prior Fiber exactly once.
- Expose fixed MCP tools for list, inspect, define, run/reload, invoke, stop,
remove, and promote; never rely on dynamic MCP schema refresh.
- Seed and execute
repo_context, git_worktree, and network_probe through
the same runtime path.
Review packet
- Explicit
(scope, name) identities prevent hidden scratch/project shadowing.
- Workspace root is an explicit CLI argument or
BUILD_WORKSPACE_DIRECTORY, never inferred from a runfiles cwd.
- A failed candidate never changes the active manifest or runtime pointer.
- Package stdout/stderr cannot corrupt MCP stdout.
- Disposable state remains under ignored
out/mcp_cordis; reusable source is
public project code.
Verdict
Refine. Candidate
c9300c9887104777c8915e3d4f390196604e9bd18497bbec319415d1a4ad057f
proved the architecture but failed acceptance criterion 7.
- Added the exact pnpm/Bzlmod/Bazel package and documentation.
- Implemented content-addressed storage, worker-isolated Cordis Fibers,
transactional generation replacement, fixed MCP gateways, and stdio entry.
- Added project and scratch scopes, promotion, recovery, and three starter
package definitions.
- Added lifecycle, in-memory MCP, subprocess stdio, and package execution
tests.
Verification evidence
bazel_agent bazel query //projects/mcp_cordis:all: pass after the pnpm v10
declaration and starter catalog were present.
bazel_agent bazel test //projects/mcp_cordis:runtime_test: pass. This covers
real Cordis contexts/effects, immutable versions, rollback, drain, scopes,
promotion, restart, removal, isolation, and fixed MCP invocation.
bazel_agent bazel test //projects/mcp_cordis:stdio_test: pass. One stdio client
hot-updated v1 to v2 without a process change; a new server process recovered
the project package.
bazel_agent bazel test //projects/mcp_cordis:starter_packages_test: fail because
repo_context_search received spawn rg ENOENT in the hermetic test PATH.
Acceptance results
- Pass: documented standalone stdio server built and exercised by Bazel.
- Pass: source and runtime tests use Cordis
Context, Fiber await/dispose,
and effect cleanup.
- Pass for implemented lifecycle operations; fixed MCP use is proven on one
connection.
- Pass: content hashes, failed syntax/startup rollback, and v1/v2/v3 behavior
are exercised.
- Pass: roots and exact scope identity are exercised in isolated workspaces.
- Pass: promotion and server-only project recovery are exercised.
- Fail: the Git and network package paths were not reached after the
repository search package required an unavailable
rg executable.
- Pass: in-memory and real stdio tests invoke new handlers through the stable
gateway without reconnecting.
- Unverified: the full integrated fixed regression set has not run.
Progress, approach, and process audit
- Criteria 1–6 and 8 improved from unverified to measured passes. Criterion 7
is an absolute portability failure, not merely a weaker result.
- Passing lifecycle and stdio tests support retaining the direct Cordis,
worker, storage, and fixed-gateway representation.
- The highest-leverage problem is removing the starter package’s undeclared
executable assumption while retaining ripgrep as a fast path.
- Continue the architecture but revise
repo_context_search; no evidence
supports discarding the runtime foundation.
- The largest avoidable delay was 144 seconds in a failed test whose worker was
not registered for unconditional teardown.
node:test cleanup now registers
before assertions, reducing the next failure cycle to under a second.
- The next feedback loop starts with the single starter target and only then
returns to the integrated regression set.
2 -
Attempt 2
Back to durable goal · Attempt history
Targeted failure
Attempt 1’s repo_context_search cannot execute when ripgrep is unavailable
from the runtime PATH, preventing all starter packages from passing their
portable Bazel execution test.
Hypothesis
Keeping ripgrep as the preferred engine but falling back on a bounded Node
filesystem search will preserve normal-machine speed and make the reusable
package functional in hermetic or minimal environments.
- Parent candidate:
c9300c9887104777c8915e3d4f390196604e9bd18497bbec319415d1a4ad057f
- Preserve all runtime, storage, MCP, and other starter-package code.
- Add a bounded fallback with workspace path checks, file/byte/result limits,
fixed or regex matching, context lines, and basic glob filtering.
- Store it as a new immutable
repo_context version; retain Attempt 1’s source
version in its manifest history.
- Rerun the starter test first, then the complete focused package checks.
Planned review packet
- Search succeeds without
rg in Bazel’s test PATH.
- Traversal outside the workspace remains rejected.
- All eight starter tools execute through loaded Cordis Fibers.
- Previously passing lifecycle and real stdio checks remain green.
Verdict
Refine. The rebased candidate commit
e3e74cb1e573867825347292bf17220a5b9a4a0c fixes criterion 7, but its final
integrated regression failed because the lifecycle test used elapsed time to
infer that an invocation remained in flight.
- Added a bounded pure-JavaScript fallback as immutable
repo_context
version
fd10633b1569665764e9a526f2cfaf38d1847ee9842934258cefc25f08ea9050
while preserving ripgrep as the preferred engine and retaining the original
version in manifest history.
- Rebased the complete task commit onto fetched remote
master
7ad2704cd27757355ab36ec8eb1bb27ef9e1d91d with no conflicts. The resulting
tree is 079a0c27b86527c6950cc75b0c8b9dbf572d3e4b.
Verification evidence
- Pre-rebase
bazel_agent bazel test //projects/mcp_cordis:starter_packages_test: pass. All
eight tools executed, including search without rg.
- Post-rebase
bazel_agent bazel query //projects/mcp_cordis:all: pass.
- Post-rebase
bazel_agent bazel test //projects/mcp_cordis:all: three of four test
targets pass. runtime_test fails at its drain-count assertion with actual
0, expected 1.
- The test starts a 150 ms invocation, waits only 20 ms, and then starts a new
worker before swapping generations. Candidate startup has no upper bound
below the old invocation’s delay, so the test does not prove the invocation
is still active at the swap.
Acceptance results
- Pass in the integrated build test.
- Unverified for final acceptance because the lifecycle regression did not
complete.
- Unverified for final acceptance for the same reason.
- Unverified for final acceptance for the same reason.
- Pass in the previously focused storage/lifecycle evidence; final rerun is
still required.
- Pass in the subprocess stdio target; final rerun is still required.
- Pass on the exact rebased candidate through the starter-package target.
- Pass on the exact rebased candidate through the stdio target.
- Fail: the complete fixed regression set is not green.
Progress, approach, and process audit
- Criterion 7 measurably improved from fail to pass; no starter package now
assumes ripgrep is installed.
- The runtime representation did not regress. The failing value demonstrates
that the old request finished before the atomic swap, which is permitted;
the test’s elapsed-time setup failed to establish its own precondition.
- The highest-leverage issue is evidence quality, not another runtime rewrite.
- Attempt 3 should preserve all delivered runtime bytes and replace only the
drain test’s wall-clock inference with a deterministic cross-worker latch.
- The requested rebase and adapter compilation dominated this cycle’s wall
time. Focused query feedback fell to under two seconds once caches were warm.
3 -
Attempt 3
Back to durable goal · Attempt history
Targeted failure
The integrated lifecycle test assumes that a 150 ms invocation remains active
after a new worker has started. Under parallel Bazel execution, the candidate
can become ready only after that invocation has completed, making the expected
drain count nondeterministic.
Hypothesis
A file-backed started/release handshake in the test package will establish the
in-flight precondition independently of worker startup speed and prove that a
generation swap reports and drains exactly one old invocation.
- Parent commit:
e3e74cb1e573867825347292bf17220a5b9a4a0c
- Parent tree:
079a0c27b86527c6950cc75b0c8b9dbf572d3e4b
- Base commit:
7ad2704cd27757355ab36ec8eb1bb27ef9e1d91d
- Preserve all product runtime, storage, MCP, package, and build files.
- Extend only the lifecycle test fixture with optional started/release paths.
- Wait for the started marker before activation, keep the old handler blocked
until after the drain count is observed, and release it in
finally so a
failed assertion cannot strand teardown.
- Rerun the focused lifecycle target first, then the entire recorded regression
set on one amended candidate.
Planned review packet
- The test contains no fixed request duration or startup race.
- Replacement reports exactly one draining call.
- The old call returns v2 and the next call returns v3.
- Cordis cleanup still runs exactly once.
- All project, buildifier, and diff checks pass on the same commit tree.
Verdict
Accept as the final local candidate. Commit
7cfef0719075ad372c3bb257ad216b35770356b2 and tree
34153eca0f582af5c641f81bf8c7209b0045ab9a pass the entire evidence plan.
Remote delivery is pending separate authorization.
- Replaced the 150 ms elapsed-time assumption with workspace-local started and
release markers in the lifecycle test fixture.
- Proved the new v3 generation serves calls while the old v2 invocation remains
blocked, then released v2 and proved its Cordis effect disposes exactly once.
- Applied Buildifier’s mechanical label ordering to the runtime test data.
- Amended the sole feature commit through the delivery adapter without changing
its direct base parent.
Verification evidence
git diff --check HEAD^..HEAD: pass on the prepared commit.
bazel_agent bazel query //projects/mcp_cordis:all: pass.
bazel_agent bazel test //projects/mcp_cordis:runtime_test: pass after the
deterministic gate.
bazel_agent bazel test //projects/mcp_cordis:all --nocache_test_results: pass,
four of four tests executed on the exact commit.
bazel_agent bazel build //projects/mcp_cordis:all: pass, all nine targets.
bazel_agent bazel test //:buildifier_test --nocache_test_results: pass.
- The delivery receipt records direct base
7ad2704cd27757355ab36ec8eb1bb27ef9e1d91d, prepared head 7cfef071, and
prepared tree 34153eca.
Acceptance results
- Pass: documented standalone Bazel-built stdio MCP server.
- Pass: lifecycle tests exercise real Cordis contexts, Fibers, and effects.
- Pass: one runtime and one stdio connection exercise the complete mutable
package lifecycle.
- Pass: immutable versions, rollback, deterministic drain, and exact cleanup
are exercised.
- Pass: isolated project and scratch roots are exercised.
- Pass: promotion and subprocess restart recovery are exercised.
- Pass: three justified starter packages and all eight tools execute.
- Pass: fixed discovery/invocation gateways work without reconnecting.
- Pass locally: all recorded checks and the real stdio transcript pass on the
exact candidate tree. Remote repository handoff remains pending authority.
Progress, approach, and process audit
- Criterion 9 improved from a nondeterministic failure to a forced, exact-tree
pass; no technical criterion regressed.
- The explicit gate improves evidence in absolute terms: candidate startup can
take arbitrarily longer than the old call without changing the assertion.
- Independent code review and the measured zero drain count both supported
retaining transactional start-before-swap behavior.
- No defect survived two attempts. The elapsed-time test and Buildifier order
are resolved in their first corrective cycle.
- Adapter and root Buildifier startup dominated wall time; warmed focused tests
remained under ten seconds. Further local optimization would not change the
delivery critical path.
- The only remaining action is remote publication, which cannot proceed from a
rebase-only authorization.
4 -
Attempt 4
Back to durable goal · Attempt history
Targeted failures and scope
PR 32 commit 7cfef071 is remotely reproducible but is not a final candidate:
three review findings are valid. The user also requires the four
projects/agents changes from PR 24, whose missing decision-review package
explains the current base’s dangling instruction reference.
Hypotheses
- Applying PR 24’s changes three-way will preserve newer
goal guidance while
importing its result-first additions, Bazel batching guidance, and
decision-review package.
- Treating command overflow as bounded success will preserve useful prefixes
for search and diff consumers without leaking child processes or invalid
UTF-8.
- Enforcing
max_changes before every porcelain status record will bound all
record kinds uniformly.
- Closing admission, draining registered package locks, then disposing active
workers will make shutdown linearizable with concurrent run/reload.
- Current and published task commit:
7cfef0719075ad372c3bb257ad216b35770356b2.
- Current base/direct parent:
7ad2704cd27757355ab36ec8eb1bb27ef9e1d91d.
- PR 24 base/head:
ada3ed90123c224729f9174c6127c50b933d2f48
/ da2085f1807bfea1c7f3979730f6b7df0033fdce.
- Import boundary: only paths beneath
projects/agents changed by PR 24.
- Review boundary: the three existing PR 32 threads and directly required
regression coverage; no unrelated runtime redesign.
- Preserve all immutable package versions already referenced by manifests.
Candidate plan
- Merge the PR 24
bazel-agent and goal hunks into current files; add
decision-review plus the offline eval structure required today.
- Add black-box execution overflow coverage and implement bounded UTF-8-safe
truncation while preserving timeout/spawn errors.
- Add table-driven status-limit coverage and publish a new immutable
git_worktree version with the limit check before record parsing.
- Add a deterministic concurrent activation/shutdown gate and memoized
shutdown sequence that waits for admitted locks before disposal.
- Run focused tests first, then both affected packages, Buildifier, exact diff
checks, delivery preparation, exact-candidate validation, publication, and
review-thread replies/resolution.
Planned acceptance packet
- PR 24 provenance maps exactly to the imported agent changes; newer main
guidance remains present.
decision-review validates and its Promptfoo configuration loads offline.
- Output at and beyond the cap is bounded, UTF-8 valid, truncation-marked, and
stopped; under-cap and timeout behavior remain correct.
- Every porcelain-v2 record kind obeys
max_changes.
- Shutdown cannot resolve before an already-admitted activation is owned and
disposed, and later calls reject
runtime_closed.
- All previous MCP lifecycle, restart, package, and stdio regressions remain
green on the exact delivered commit.
Progress, approach, and process audit
- Remote publication improved delivery evidence but exposed three absolute
correctness failures; validation success alone was insufficient.
- The PR 24 request resolves an upstream packaging inconsistency and is
independent enough to integrate before runtime corrections.
- The current representation remains viable: every defect has a narrow
controlling mechanism and deterministic test. No evidence supports replacing
Cordis, the worker boundary, or content-addressed persistence.
- Imported all four PR 24 agent-tree changes three-way and added the offline
validation files required by current repository policy.
- Changed
ctx.exec() overflow from an output-limit rejection to a bounded,
UTF-8-valid success result with explicit process-group cleanup and a
truncation flag.
- Published the corrected Git parser as new immutable version
de978... while
retaining 70d8... as permanent rollback history.
- Made shutdown join admitted activation locks before its final active-worker
snapshot and added closure checks around initialization storage awaits.
- Added direct regressions plus an actual
git_compare cap integration case.
Verification evidence
- Four focused Bazel tests: pass.
- Complete MCP package plus three skill eval-config targets: ten of ten pass.
- Complete MCP package build plus three skill libraries: pass; all skill
validation aspects pass.
- Root
//:buildifier_test: pass.
- JavaScript syntax, exact new version SHA-256, quick skill validation, and
git diff --check: pass.
Final verdict
Refine. The product and packaging gates were green, but independent review
found silent output-loss and exact-limit semantics that those gates did not
exercise. Preserve the architectural changes; Attempt 5 changes the affected
contracts and tests rather than discarding the worker/runtime design.
5 -
Attempt 5
Back to durable goal · Attempt history
Targeted failures
Attempt 4 passed every recorded command but independent review disproved four
completeness claims: malformed UTF-8 loss was unmarked, built-in consumers
silently accepted partial host output, Git status truncation was inferred from
capacity rather than omission and missed newline paths, and imported skill
evals did not cover their added behavior.
Hypotheses and plan
- Have UTF-8 decoding report whether it dropped any retained bytes and OR
that fact into
truncated; cover malformed output below and above the cap.
- Publish new immutable versions for each reusable package whose result fields
need host-truncation propagation. Preserve every previously tracked version
byte-for-byte and make partial fields explicit rather than hiding signal
termination as ordinary success.
- Parse status records before deciding whether an additional logical change
was omitted, capture NUL-delimited paths with newline-safe expressions, and
cover exact-one, max-two, max-one-of-two, copy, and newline cases.
- Add offline cases that exercise compatible multi-target Bazel batching,
immutable exact-hash candidate promotion/regression, and durable task-owned
push behavior that excludes disposable output and reports blockers.
- Track disposal of an activation removed by
#handleUnavailable() as a
retirement so shutdown cannot return before its worker teardown completes.
- Rerun each focused target, all affected package/skill tests and builds,
Buildifier, and another independent review before freezing a commit.
Boundaries
- Retain the Cordis/worker/storage architecture and the shutdown correction.
- Do not modify historical hash-named version bytes.
- Do not import any PR 24 path outside
projects/agents.
- Do not add live, billable eval targets; these cases extend the existing
offline-validated behavioral configurations.
- Do not prepare, commit, or publish until the new review is clean.
Planned acceptance packet
- Every discarded output byte makes
truncated true.
- Each Git/context field that can be partial exposes that fact; bounded diff
and search remain successful.
- Shutdown joins teardown for generations that become unavailable immediately
before shutdown, not only those still present in the active map.
- Exactly
maximum status changes reports complete, while an actual additional
parseable change reports truncated; valid newline paths round-trip.
- Eval configs validate with cases for every material imported behavior.
- A second independent read-only review reports no remaining actionable issue.
Working-tree result
ctx.exec() now retains a combined bounded prefix, marks byte overflow and
malformed UTF-8 loss as truncated, and stops the child before resolving.
repo_context activates immutable version abd0db3e...; root, HEAD,
status, and ripgrep results propagate host truncation explicitly.
git_worktree retains original version 70d8f28d... unchanged and activates
sole new version 8853aa20.... The rejected intermediate de978... file is
absent. Exact-limit status, newline paths, incomplete NUL records, revision
discovery, history, name-status, diff, and aggregate flags are covered.
- Runtime shutdown is memoized, closes admission, joins admitted package
operations, and tracks disposal after an unavailable activation leaves the
active map.
- PR 24’s
projects/agents subtree is integrated as bazel-agent, goal, and
packaged decision-review changes only. Newer goal-record and delegation
policy is preserved; added eval cases exercise every material imported rule.
Validation evidence
- Focused Bazel regression/eval batch: 8 of 8 tests pass.
- Entire affected MCP package plus skill evals: 12 of 12 tests pass.
- Entire MCP package and all three skill libraries build; every skill
validation aspect passes.
- Root
//:buildifier_test: 1 of 1 passes.
git diff --check, JavaScript syntax checks, and every retained/new reusable
package content hash pass.
Progress, approach, and process audit
Attempt 5 materially closes every falsified completeness claim from Attempt 4
without replacing the accepted architecture. New versions are confined to
the two reusable packages whose public result contract changed; historical
bytes remain intact. The test packet now observes semantic completeness rather
than only byte caps or array lengths. The remaining critical path is review
and exact-candidate delivery, not additional implementation.
Verdict: proceed to independent review. Do not freeze or publish the candidate
until that review is clean.
Independent-review correction 1
The agent-skill review found that PR 24’s absolute “commit and push every
turn” wording contradicted the preserved throwaway-record policy when a
rejected attempt leaves no durable tracked change. The merged skill now makes
delivery conditional on authorized, nonempty durable tracked progress and
explicitly forbids empty/cosmetic commits or promoting disposable out/
evidence merely to manufacture a checkpoint. A new offline case covers the
no-durable-output rejection. This changes the candidate and invalidates the
prior goal eval result; rerun the affected skill and integrated gates after
the remaining reviewers report.
The follow-up review also found that the durable-progress eval incorrectly
required preparation while remote-ref ownership was unknown. Its oracle now
requires exact inspection followed by a safe stop before preparation, rewrite,
or publication until ownership is established.
The review then found that decision-review’s self-contained case could run
meaningfully with the available provider, so offline validation alone did not
satisfy current skill-package policy. A manual, credentialed promptfoo_test
target now complements the ordinary offline validation target; it is declared
but will not be executed as part of normal or delivery validation.
The generic goal skill also carried Blender-specific scene, topology,
datablock, and linked-library mechanics from PR 24. Those details could
misroute domain policy into software and documentation goals. The merged text
now retains only the cross-domain invariant: immutable candidate copies, one
writer per candidate, exact or deterministic component promotion, and
post-promotion regression. Its eval uses a generic protected deliverable. The
bazel-agent eval documentation now correctly describes its plural cases.
The generalized component-promotion rule initially tried to compare a
component-merged aggregate with a whole-candidate hash, which is impossible.
It now distinguishes exact whole-candidate promotion from independently
hashed component promotion and always reruns affected aggregate gates.
The first manual decision-review target reused credentials without isolating
subject and judge state. Its config now uses separate runner-provided Codex
homes and workspaces, an explicit executable override, and isolated proxy
inheritance; its README documents the required absolute-path invocation.
6 -
Attempt 6
Back to durable goal · Attempt history
Why Attempt 5 was rejected
Attempt 5 passed every repository gate, but the required second independent
review found release-blocking lifecycle and compatibility defects: worker
termination could orphan detached ctx.exec() children, promotion was outside
shutdown admission, unavailable candidates could cross the persistence/swap
boundary, and the new always-partial output contract made retained package
versions lie about completeness. The same review found narrower package and
imported-skill correctness gaps. The candidate is rejected despite green
tests.
Strategy reset
- Preserve backward compatibility by making partial output an explicit
ctx.exec() option. Existing package versions retain rejection on overflow;
new versions opt in and receive an explicit output-limit reason alongside
truncated.
- Close worker disposal admission before spawning, clean child process groups
both before and after admitted handlers settle, and replace immediate parent
termination with graceful disposal followed by the existing bounded forced
fallback.
- Track complete promotion operations in the runtime admission barrier and
stage candidate availability across persistence so a failed candidate cannot
replace or persist over the working generation.
- Publish sole new immutable starter versions after correcting unexpected
signal/error handling, exact-boundary flags, omitted-record flags, Git
read-only behavior, robust history framing, and containment checks. Delete
every rejected untracked hash candidate rather than retaining it as history.
- Pin LF checkout semantics for hash-addressed source and test retained-version
compatibility, exact output boundaries, outer timeouts, settlement-after-
group-confirmed settlement, late-spawn disposal, promotion shutdown, and
candidate failure.
- Finish the PR 24 merge by keeping generic goal invariants generic and making
the manual
decision-review eval isolate subject and judge state.
Boundaries
- Do not change any previously tracked hash-named source bytes.
- Do not add PR 24 paths outside
projects/agents.
- Do not run the credentialed manual Promptfoo target.
- Linux is the supported supervised-execution platform for this repository
target. The guarantee covers the direct child and live descendants that stay
in its original process group; deliberate new sessions are excluded.
- Keep one writer per runtime source group and one writer for all active
content-addressed package candidates/manifests.
Acceptance packet
- No live member of a supervised original process group survives inner timeout,
outer invocation timeout, disposal, shutdown, or successful truncation
settlement.
- Shutdown waits for every admitted mutation, including promotion, and never
publishes a candidate observed unavailable during persistence.
- Historical package versions reject overflow under their original contract;
only explicit opt-in versions return a marked partial prefix.
- Every result field distinguishes complete, locally clipped, host-limited,
failed, and unexpectedly signaled outcomes.
- Exact limits are complete until one additional logical record is observed.
- All content hashes, LF attributes, skill validation, offline eval configs,
focused regressions, integrated tests/build, and Buildifier pass.
- A fresh review of the final Attempt 6 diff reports no release-blocking issue.
- Restored the historical
ctx.exec() contract: overflow and invalid UTF-8
reject by default, while new packages opt into a bounded marked prefix.
- Moved process launch and output accounting from the disposable worker into a
parent-owned Linux supervisor. Launch admission is atomic in the parent’s
event loop, direct exit terminates the original process group before inherited
pipes can hold settlement open, and timeout/disposal results wait for group
non-liveness.
- Narrowed the documented contract honestly: a package that deliberately calls
setsid() or otherwise creates a new session is outside the trusted original-
group guarantee; non-Linux execution fails closed.
- Made shutdown actively dispose both active and draining retired generations,
and staged candidate persistence so an unavailable candidate rolls back
without displacing the working generation.
- Published one current source candidate per starter package. The hashes are
04b06a7d6277c4a6e8513d970f549ad980a780b68755f28d7b402fe8be26c279
for git_worktree and
94131e058f82328f091613dc68d2717484378066a9c64940d99522c14b48b4d7
for repo_context; historical source bytes remain unchanged.
- Made ripgrep byte-valued JSON fields explicitly incomplete rather than
returning empty text under a false completeness claim.
- Imported PR 24’s agent skills, added current validation/eval packaging,
generalized goal policy, and moved this complete goal directory into the
reusable project docs hierarchy.
Verification so far
- Static syntax, manifest/hash, LF-attribute, local-link, and
git diff --check
checks pass on the corrected working tree.
- Focused process, unavailable-shutdown, and retired-generation tests pass 3/3
in Bazel invocation
9b1b2d34-8490-474a-b12c-e2052bf2d90b.
- Process, package-byte-field, and retired-generation tests pass 3/3 in Bazel
invocation
7c680be8-e2a6-4b5b-9b45-4a0390f39a5a.
- The earlier 14/14 integrated packet, complete affected build, validation
aspects, and Buildifier passed before the supervisor and final package-byte
corrections. Those results are preserved as progress evidence but are
invalidated for final acceptance and must be rerun.
Independent-review result
The first final review rejected the candidate despite green tests. It found
that outer timeouts settled before cleanup, a signal was mislabeled as reaping,
the shared PID publication window made disposal unbounded, inherited pipes
could delay successful commands, retired generations were not actively
disposed by shutdown, ripgrep byte fields could masquerade as text, and the
durable records were stale. The strategy changed from worker-side process
ownership to parent-owned supervision; every other finding has a direct source
or regression correction. Fresh review of that new strategy is pending.
Acceptance status
- Criteria 1-8: pass on implementation and existing executable evidence.
- Criterion 9: unverified after the latest source changes; full exact-candidate
validation and delivery remain.
- Criterion 10: focused regressions pass; fresh adversarial source review is
still pending.
Progress, approach, and process audit
Attempt 6 improved compatibility, package completeness, promotion admission,
and teardown coverage in absolute terms. The repeated late lifecycle findings
showed that PID publication inside a terminable worker was the wrong ownership
boundary, not merely an under-tested implementation. Moving execution to the
parent removes that race and makes cleanup ordering directly observable. The
highest-leverage remaining work is review and full validation of this new
boundary, not more feature expansion. The attempt remains open until that
review accepts one frozen candidate and delivery verifies the same bytes.
Decision
Refine within Attempt 6: the review changed an implementation strategy without
changing the recorded goal or acceptance contract. Do not freeze or deliver
until fresh review and the complete invalidated regression set pass.
7 -
Attempt 7
Back to durable goal · Attempt history
Why Attempt 6 was rejected
The user correctly identified that each package’s manifest.json,
content-addressed versions/ directory, and active/latest pointers were a
custom package manager rather than an MCP or Cordis standard. That mechanism
made reusable source look temporary, duplicated Cordis loader responsibilities,
and drove much of the worker-generation complexity. Green tests cannot justify
shipping the wrong extension model.
Decision review
Verdict: revise and proceed. The published DeepSeek Cordis packages provide
the missing standard mechanisms directly:
@deepseek-ai/cordis-plugin-loader owns runtime entries and lifecycle;
@deepseek-ai/cordis-plugin-include persists entries in cordis.yaml and
transactionally refreshes them with rollback; and
@deepseek-ai/cordis-plugin-hmr watches normal modules, imports changed code
before replacement, and restores the prior runtime when reload fails.
The strongest objection is that HMR is event-driven and failed source reloads
are logged rather than returned to the file writer. MCP-driven updates must
therefore retain prior bytes, wait for a correlated reload result, and restore
the prior source on failure or timeout. Manual external edits retain Cordis
HMR’s normal behavior and diagnostics.
Frozen plan
- Pin the exact released Loader, Include, HMR, Timer, and required peer
dependencies through the project-owned npm lock.
- Replace package manifests and hash-named versions with normal ESM modules:
reusable modules under
projects/mcp_cordis/plugins/, disposable modules
under out/mcp_cordis/plugins/.
- Make
projects/mcp_cordis/cordis.yaml and
out/mcp_cordis/cordis.yaml the authoritative standard entry lists.
- Mount the official Cordis Loader, two Include trees, Timer, and HMR in the
stdio server. Keep the stable MCP gateway, workspace helpers, bounded
process execution, and tool-registration effects as host services.
- Implement MCP define, update, start, stop, remove, and promotion as atomic
source/config changes followed by Cordis lifecycle acknowledgement and
rollback. Use Git for reusable history; do not create a second version
database.
- Replace version-store tests with standard-config, restart, HMR rollback,
manual-edit reload, and project/scratch promotion tests.
- Run the complete affected test/build/Buildifier packet, obtain a fresh
independent review of the standard design, then rebase and deliver PR 32.
Boundaries
- Do not add an MCP Registry
server.json unless the server is actually being
prepared for registry publication; it describes the whole server, not its
internal Cordis entries.
- Do not retain committed hash-named source snapshots or custom package
manifests.
- Keep reusable source and config in the project and all disposable modules,
atomic-write scratch, state, and logs under
out/mcp_cordis.
- Keep one normal module per package and one stable entry id per scope.
- Preserve PR 24’s scoped
projects/agents import and the accepted process
execution corrections that remain relevant to the in-process host.
Acceptance status
Implementation and working-tree validation are complete; exact post-rebase
delivery gates remain open. The final architecture adds four narrow host
guards around the official Cordis services: synchronous activation admission
to prevent a never-settling apply(), source-token HMR correlation, a private
stdio protocol stream, and Fiber/invocation-owned Linux process supervision.
The real stdio regression covers define, inspect, run, invoke, update, failed
update rollback, stop, remove, logging isolation, and restart recovery.
Bazel invocation 39711671-375a-413f-8a72-e6f9ff892bd3 passes all 11 affected
tests on the rebased implementation after the import-boundary review
corrections, including Buildifier and all three imported skill configurations.
Invocation 153467fd-e62d-4eab-b260-6754d17fe8e2 builds all 26 affected
targets. Those receipts bind implementation commit 0a93e487; the following
amendments change only this durable goal record, with proportional diff and
format validation required before publication. Fresh independent review
accepted durable-record commit c05bd45a with no actionable findings.
PR 32 was republished at the verified rebased head, its obsolete description
was replaced, and all three prior review threads were resolved.
8 -
Attempt 8
Back to durable goal · Attempt history
Trigger
The fresh hosted review of the delivered standard-Cordis candidate found three
valid starter-package defects: the JavaScript search fallback recursively read
ignored and hidden files when ripgrep was absent, fallback submatch offsets
used UTF-16 code units instead of ripgrep-compatible UTF-8 bytes, and a bounded
textual HTTP body could end with a replacement character when the byte limit
split a multibyte sequence.
Corrections
- The JavaScript fallback now fails closed for directory searches and supports
only explicitly selected files. This preserves hermetic single-file fallback
without silently weakening ripgrep’s hidden and ignore filtering.
- Fixed-string and regular-expression fallback matches calculate
start and
end from UTF-8 byte lengths.
- Textual HTTP previews discard only an incomplete trailing UTF-8 sequence;
the raw retained-byte count and truncation signal remain exact.
- Follow-up review found that case-insensitive fixed matching could still use a
length-changing lowercased index, explicit files did not override globs as
they do in ripgrep, and unfiltered listing reparsed a malformed scope instead
of returning the healthy scope with an error.
- Case-insensitive fixed fallback now matches against the original line with a
Unicode regular expression, explicit files bypass fallback glob filtering,
and unfiltered listing returns per-scope errors alongside healthy packages.
Explicitly listing a malformed scope continues to fail directly.
- Final hosted review showed that a valid config with an unavailable module
still bypassed the malformed-config catch, and bounded reads reported the
requested range end instead of the last retained line. Unfiltered listing
now skips every scope whose Include failed to mount, and bounded reads derive
endLine from retained content.
- Fresh diff-focused correctness scrutiny then found that repeated
initialize() calls lost the original partial-startup errors. The runtime
now preserves and clones those errors across idempotent initialization.
- The same scrutiny found that incomplete UTF-8 suffix removal also ran for a
naturally completed malformed textual body. It now runs only when the local
byte cap truncates the response; naturally malformed bytes retain the prior
replacement-character preview.
- The repository’s
repo-delivery skill now invalidates prior correctness
verdicts after behavior-changing edits and requires proportional adversarial
scrutiny in addition to test reruns.
- Exact-thread reconciliation after the final hosted review exposed one older
unresolved finding and one new finding: the explicit-file regex fallback
matched UTF-16 surrogate halves, and
cordis_define plus cordis_promote
advertised overwriting operations as non-destructive. Regex fallback now
uses Unicode scalar mode, and both source-overwriting tools carry the
destructive MCP hint.
- The next exact-commit review found two more fallback-boundary defects:
adjacent matches were also emitted as context, and a retained empty line was
reported like a request past EOF. Fallback search now plans a single ordered
event stream from all matching lines, and bounded reads track range existence
independently from textual content.
Evidence
- Focused invocation
b73ce3b4-bfb6-4081-b84f-29c3f763b3a4 passes both
corrected starter-package test targets.
- Complete MCP test invocation
93845f08-cd10-4dfb-88c5-034497dea58a
passes all 7 tests; build invocation
d7716a48-9509-44fe-9e37-b5c44904fffd builds all 16 targets.
- Buildifier invocation
1fb561cc-d336-49db-813f-de26b7fedbe4 passes.
- Regression cases prove directory fallback fails closed while an explicitly
selected hidden file remains available, both fallback engines report byte
offsets for
éneedle, and a one-byte preview of é returns an empty valid
UTF-8 prefix rather than U+FFFD.
- Follow-up focused invocation
c07704be-cdf8-4045-a0c0-4626ebc0d1e7
passes both affected targets. Complete test invocation
3fbaa4e1-8ea1-4b3f-a533-51e1ad01f87b passes all 7 tests, build invocation
f87e45b6-765e-49c8-a618-cd2eb1efa1ad builds all 16 targets, and Buildifier
invocation 8542838d-92ae-4999-b1e8-fac631629f6f passes.
- Final-cycle focused invocation
99866999-c31d-457f-b64b-c7a15073e7a2
passes both affected MCP tests. Combined affected invocation
e86a5d1c-cadf-4ff6-9647-3e1050e461e6 passes all 8 MCP and skill tests;
083fbf55-851e-4db4-b8e5-e5871c874faa builds all 19 affected targets.
Skill quick validation and Buildifier both pass.
- Focused starter invocation
e80439df-bddd-4a76-b9e1-be6c7f1ed649
distinguishes a cap-split multibyte prefix from a naturally completed
malformed textual body.
- Exact aggregate validation exposed timing-sensitive evidence: a wall-clock
admission bound failed under load, and the expected invocation timeout could
reject before its assertion was attached. The test now asserts the wrapped
synchronous-admission semantics and attaches the expected rejection before
waiting for its PID fixture. Invocation
e7d69598-b843-4da4-833b-e024d406b8ca passes three consecutive runs.
- A later loaded aggregate run exposed a real HMR rollback race. Cordis restores
the prior module cache after a failed import without emitting a reload event;
the host unnecessarily waited for a second filesystem reload that could be
absent. Rollback now accepts the already-restored prior source marker and
waits for HMR only when the failed candidate actually reached the cache.
Invocation
5f9b49e0-d3d3-4f9e-84ec-602dfbe38c77 passes three runs.
- Focused invocation
132e2f33-837c-40b2-83b5-4b06ceadfd0f passes the
Unicode fallback and real-stdio MCP annotation regressions.
- Complete affected invocation
b19d303e-0aca-4097-a191-e81015dc2982
passes all 8 MCP and skill tests; build invocation
1c8aa274-dd72-4e6f-9491-de5e283b2c5c builds all 19 targets, and
Buildifier invocation 34f6f5c7-7f44-478b-b939-63ac03c3bbb1 passes.
- Focused invocation
2528b6ee-7d82-48c9-a607-298a4cef0b9b proves adjacent
matches remain ordered match events and empty retained lines report their
actual endpoint while a request past EOF reports null.
Verdict
Accept locally. Publish the exact follow-up correction commit, resolve the
hosted review threads, and verify the remote head before final handoff.
9 -
Attempt 9
Back to durable goal · Attempt history
Trigger
The user rejected the growing HMR race-handling layer and explicitly requested
the simplest robust way for an MCP server to load DeepSeek/Cordis plugins. The
published parent is bc4e5ae97ef9ea968c01b1b2a55403ae032a6a8d. An
unpublished polling experiment is rejected rather than promoted.
Hypothesis
Atomic persistence plus the official Cordis Include and HMR services is the
smallest reliable boundary. If MCP source mutations stop claiming synchronous
activation or transactional on-disk rollback, the runtime can delete its
source-marker protocol and every dependency on Loader internals while still
loading, invoking, and eventually hot-reloading normal Cordis plugins without
restarting the MCP connection.
Frozen plan
- Keep standard
cordis.yaml, ordinary plugins/*.mjs, and the two project
and out/mcp_cordis scopes.
- Keep the fixed MCP list/invoke gateway and the existing package context API.
- Validate module syntax before an MCP write and use atomic file replacement.
- For an existing running module, return after persistence with
persisted: true, sourceChanged: true, and activation: "pending";
official Cordis HMR owns eventual activation. Do not claim that every
evaluation or apply() failure restores the prior live entry.
- Keep public Include refresh for entry-list changes, because it is the
official transactional API for starting, stopping, adding, and removing
entries.
- Delete injected source markers, HMR acknowledgement waiters, polling,
Loader
loadCache inspection, and MCP-owned source rollback.
- Update documentation and tests so success means persisted/configured, while
live update is verified by bounded eventual observation.
- Retain and validate the two pending
repo_context review corrections for
ordered context events and empty-line endpoints.
- Register the server in the trusted workspace’s
.codex/config.toml. Use a
worktree-resolving launcher and Bazel’s run --script_path handoff so the
long-lived MCP does not retain the Bazel output-base lock.
- Rebase onto
d29f9d471ea467e8dfc75db4eedeedbbae43dc2d, preserve its
projects/goal redesign, and discard the superseded in-place goal-skill
edits rather than replaying them.
Planned review packet
- Focused runtime, stdio, and
repo_context tests.
- Complete
//projects/mcp_cordis:all tests and build.
repo-delivery skill tests and root Buildifier.
- Fresh diff-focused scrutiny of update failure, disabled-entry, promotion,
restart, shutdown, and watcher timing paths.
- Independent review and exact PR 32 thread reconciliation before delivery.
Current verdict
Refine. Removing wrapper-side acknowledgement machinery was correct, but an
independent reproduction proved that unmodified HMR 1.0.16 can lose a source
change arriving during an in-flight reload. Attempt 10 keeps the thin wrapper
and moves serialization into a focused, reproducibly pinned dependency patch.
The separate delivery-adapter refusal still prevents the history rewrite.
10 -
Attempt 10
Back to durable goal · Attempt history
Trigger
Independent review of Attempt 9 reproduced a lost update in pinned
@deepseek-ai/cordis-plugin-hmr 1.0.16. A slow top-level-await replacement
followed by a second source write left the latest bytes on disk while the
earlier generation remained live. The public HMR surface has no module-failure
event, so a wrapper-side single-flight gate cannot be both safe and
recoverable.
Hypothesis
The narrowest robust correction belongs in HMR’s own reload scheduler. A
standard pnpm dependency patch can serialize partialReload() calls, snapshot
each observed change set, and drain changes arriving during an in-flight
reload. mcp_cordis then remains a thin persistence and invocation gateway
without source markers, Loader-cache inspection, polling, or acknowledgement
state.
Frozen plan
- Keep the standard Cordis Loader, Include, Timer, and HMR services and normal
cordis.yaml plus ESM plugin files.
- Patch the exact HMR 1.0.16 artifact through pnpm
patchedDependencies.
Track one module-refresh task, snapshot its stashed URLs before each reload,
and drain any URLs observed while that reload is running.
- Patch both the published JavaScript and TypeScript source shipped in the
package; bind the patch through the generated lockfile and Bazel module
extension data.
- Add explicit release-gated overlapping-update regressions for slow
top-level module evaluation and slow asynchronous
apply() activation.
- Refresh a disabled entry’s exact cached module through HMR before enabling
it, so activation returns only after the latest persisted source is live.
- Adopt the fetched base’s role-based layout: command files under
cmd/mcp_cordis, private implementation under internal, and the separate
suite under test.
- Preserve the two accepted
repo_context review corrections and the
worktree-local launcher.
- Stop before Git history mutation until the delivery adapter has an
authorized, guarded path for the nine-commit feature range.
Current evidence
- The package registry and upstream repository both expose 1.0.16 as the
latest official HMR release; its source still invokes untracked concurrent
partialReload() work and clears the shared stash after one successful run.
git apply --check accepts patches/hmr@1.0.16.patch against the exact
resolved package bytes. Its SHA-256 and lockfile patch hash are both
ec800d86298faacc86c7717ffa1dce7c28116ab1393b8abc198be6ac02c38489.
- The patch serializes module reloads through complete Cordis Fiber cleanup
and activation, drains newly stashed URLs, preserves and retries changes
after unexpected scheduler failures, and declares its public refresh API in
the shipped TypeScript declarations.
- Bazel invocation
ac79a8e4-f5d9-4dd7-a821-29bce3d8ece6 passes the focused
runtime suite with explicit top-level-evaluation and asynchronous-apply
overlap gates, failed-apply rollback and recovery, manual-edit, and disabled
activation regressions.
- Bazel invocation
65c1932a-896b-470d-9462-086dd93beaff passes ten runs each
of runtime_test and starter_packages_test.
- Bazel invocations
6490dd57-49e0-4558-b280-f5625db07208,
218e5797-b2d7-44bc-aded-f5df8139ca1c, and
09d4ec2c-aac1-4509-8579-5ef8c5eebe39 pass the complete project tests,
complete project build, and root Buildifier check respectively.
- Final independent HMR review accepts the patch identity, stashed-change
draining, complete Fiber cleanup join, public declarations, causal overlap
tests, rollback and recovery, and disabled-entry activation behavior. Its
sole remaining finding was the corrected README publication-order wording.
- The checked-in workspace launcher completed MCP initialization and returned
all ten gateway tools while concurrent Bazel query invocation
7739c14e-1b22-40c7-94af-b81143e84d4a completed successfully; SIGINT then
produced a clean server shutdown.
- Preliminary current-tree Bazel invocations
95d37231-63f9-44f6-9eee-3f0fe8fb4107,
d70f61a2-57e5-4ce9-b8fd-27b06bd02a6d, and
1e186c82-3bcd-4048-a534-fe747e1cf79c pass the complete affected test
packet (10/10), affected build packet, and root Buildifier check.
- Guarded delivery inspection found local and remote feature OID
bc4e5ae97ef9ea968c01b1b2a55403ae032a6a8d, base OID
d29f9d471ea467e8dfc75db4eedeedbbae43dc2d, same-repository PR 32, SSH
transport, and nine linear commits all authored and committed by the task
bot. Its sole refusal is version 1’s unconditional multi-commit range
refusal; the fetched base contains the same limitation and no explicit
consolidation authorization.
- The user then explicitly authorized extending the adapter. The new
prepare --consolidate <exact-head> path retains every other refusal and
requires a single-parent chain, identical author and committer identities,
the oldest commit’s ownership marker, unchanged pull-request projection,
and signature preservation. It creates one aggregate commit while binding
the original remote head into the normal publication receipt.
- Bazel invocations
574dadd5-51b1-443e-b8c2-50ca5d257eb2 and
030a8bb4-2a22-4ece-b632-b3c75572bcee pass the complete adapter suite once,
then its Go, skill-validation, and root Buildifier targets three times.
- Independent adapter review found that the first implementation required an
extra staged edit and therefore could not consolidate an already-clean
range. The corrected gate permits an unchanged index only after exact
consolidation evidence; parent-to-tree scope validation still rejects an
empty aggregate. A clean
--path integration case proves tree preservation
and one final commit. Bazel invocation
0d715375-6a8d-4269-ad3e-f8a002888808 passes the corrected suite, and the
independent re-review accepts it with no remaining findings.
- Upstream incorporation review preserves the new
projects/goal project,
drops the deleted predecessor skill under projects/agents, adopts the
role-based MCP layout, and adds root-consumer visibility to the branch-owned
decision-review skill. The root discovery-link entry must be added after
the new base is applied.
- After that visibility correction, Bazel invocations
6099d90d-0ade-43b2-b50b-8f7050c26c32 and
7f4b37a4-b970-46ea-bc76-b4a60aeeab59 pass the focused skill validation and
root Buildifier check; git diff --check also passes.
Current verdict
Proceed. The dependency-layer correction addresses the reproduced race and
failure recovery at Cordis’s owning lifecycle boundary while the MCP wrapper
remains a thin persistence and invocation gateway. The complete local project
packet and focused independent review pass. Exact-candidate validation,
rebase, publication, and hosted-thread reconciliation remain open.
11 -
Attempt 11: exact consolidated rebase
Back to attempt history | Back to durable goal
Objective
Replace the nine task-owned feature commits with one aggregate commit, rebase
that exact candidate onto the current remote base, preserve the incoming goal
and skill-discovery layouts, and establish publish-ready evidence without
bypassing repo_delivery.
Reconciliation
- The fetched base advanced to
63e7b9f0be1e054373415914ff3d2ea2282aa3da and added the reusable
projects/goal project, per-skill discovery links, decision-review, and
exact-head remote-review waiting rules.
- The old agent-local goal skill remains deleted. The durable MCP goal stays
under
projects/mcp_cordis/goals/runtime_extensions.
- The branch keeps the upstream root discovery target, including
decision-review and projects/goal/skills/goal, and combines the incoming
review-waiting policy with the branch’s correctness-revalidation policy.
Delivery adapter corrections
The authorized consolidation path exposed four fail-closed edge cases during
the real rebase:
- Existing PR text must match the requested aggregate projection, rather
than the obsolete first commit’s projection.
- Explicit staging must handle deleted paths, partial directory deletions,
and a tracked symlink replaced by a directory.
- Patch files need the standard repository-wide whitespace exceptions for
structural context prefixes.
- A rebased aggregate path may disappear only when the prior candidate and
new base contain the exact same Git tree entry. The receipt then records
the reduced path set; added paths, non-identical loss, and an empty
aggregate remain refusals.
Each case has focused integration coverage. Every failed preparation restored
the original branch, index, and worktree before the next correction.
Exact candidate evidence
repo_delivery prepare --consolidate produced one commit on the fetched
base. The first exact code candidate before the final adapter-and-record
update was
f1c313b0920cb92f2d643dcb5c7d79ab364df058.
- Bazel query invocation
5ad9400e-f7b8-4688-9b8c-e962f3de8e66 discovered
the affected MCP, delivery, and skill targets.
- Bazel test invocation
13588b19-1f8a-43a7-8006-f9d5d4652670 passed all
12 affected tests, including Buildifier and discovery-link validation.
- Bazel build invocation
5863ac24-3bb2-47be-99fb-50141e933018 passed all
29 affected targets.
- The real launcher initialized, listed all ten gateway tools, and remained
live while Bazel query invocation
4637f187-d05e-4905-8153-18fca8644ea1 completed. SIGINT then terminated
the server as expected.
git diff --check passed and the worktree remained clean after validation.
Verdict
The aggregate was published as a single commit on PR 32 and its delivery
receipt verified the local tree, remote feature ref, current base ancestry,
and PR projection. The exact-head hosted review found three additional issues:
- repository reads reopened a checked symlink through its lexical alias;
- permanent
/proc inspection failures could prevent shutdown from settling;
- the process-tree timeout regression assumed Node could start within 100 ms.
The final correction reads through a canonical, no-follow file handle and
verifies that handle through /proc/self/fd before consuming bytes, turns
repeated process-inspection failures into a bounded EXEC_CLEANUP result, and
uses a startup-safe timeout in the process-tree regression. The full MCP test
and build packets pass, and both focused targets pass three repeated runs.
The review threads are reconciled through the receipt-bound delivery adapter.
The follow-up exact-head review found the same replaceable-path class in
git_worktree: discovery verified one repository directory, but later Git
commands reopened its lexical path. Git discovery and every subsequent
command now use /proc/<pid>/fd/<fd> paths backed by verified open directory
handles, while the subprocess working directory remains workspace-local.
Focused mock coverage checks every Git -C path and the real Cordis starter
package integration passes. The next pass found the same class in
repo_context’s ripgrep and Git metadata branches; both now use verified
descriptor paths for the complete subprocess lifetime, and directory listing
uses the selected directory handle as well. Attempt 11 is accepted and the
goal is complete. The terminal exact-head review then identified that the
JavaScript regular-expression fallback could both block the MCP event loop on
pathological backtracking and disagree with ripgrep’s Unicode semantics. The
fallback now fails closed for regex requests when ripgrep is unavailable;
bounded fixed-string search remains available. Focused and complete MCP test
and build packets pass after that correction. The next exact-head pass found
that replacement decoding of invalid UTF-8 also changed fixed-search raw byte
offsets. The fallback now fails closed for such files as well, leaving raw-byte
search semantics to ripgrep; the focused, complete test, and build packets
again pass.